Images from Houston press conference
Coulomb’s charging stations come to Houston. Below are some photos from the press conference at City Hall.
The ten charging stations available for consumer and City fleet use are part of a public demonstration project, dubbed the “Power of the Plug-In”, and funded by Reliant Energy one of the largest retail electric providers in Texas. The ten Reliant-provided charging stations will be located around Houston, with public stations at City Hall, the Health Department office at 8000 Stadium Drive and at the Mayor’s Citizens Assistance Office at 9615 Rustic Wood, Kingwood.
Coulomb’s South Central U.S. distributor Verdek Corporation provided sales and support for the ChargePoint® Networked Charging Stations installation.
-
-
President of Reliant Energy, Jason Few
-
-
Houston Mayor and Reliant President greet the press
-
-
One of 10 Coulomb charging stations installed.
-
-
Houston Mayor Bill White
-
-
Coulomb charging stations for EV
Tags: Houston Charging Stations for EV
This entry was posted
on Wednesday, November 18th, 2009 at 8:26 am and is filed under EV / Green Events.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.